We have created this Thermacoil Installation Case Study page to enable you to see before and after images of a typical installation.  The Waterfront, Hertford, SG14 1SD, PulsaCoil 2000 Replacement Case Study features a residential building made up of 85 high quality one and two bedroom flats that are located opposite the River Lea and Hartham Common. Miss P is just one of the many people that we work for in this area.

The Waterfront, Hertford, SG14 1SD, PulsaCoil 2000 Replacement Case Study

Miss P called The Plumbing Group Limited when a tenant informed her that she was no longer getting any hot water. Our engineer went out to the flat to check the boiler over. After a full inspection, it was found that the internal cylinder was split and leaking. As a result, it became beyond economical repair and had to be replaced. Luckily, our engineers were able to do a temporary fix while the new boiler was on order.

Miss P opted for a ThermaCoil replacement option over the new PulsaCoil PCS. This is because the Thermacoil is a far less complicated system. Within a PulsaCoil parts include; a Printed Circuit Board, Pump, Sensors and Relays. This differs from the ThermaCoil which has replaced these components with a single mechanical blending valve. For the user of the system it is no different yet for long term maintenance it is much simpler.

The installation was carried out in under four hours and the old unit was removed and ethically disposed of.

The new ThermaCoil comes with a 10 Year Manufacturers cylinder warranty, for further details visit www.thermacoil.co.uk