Balmoral Apartments, London, W2 1AL, PulsaCoil 2000

We have created this PulsaCoil 2000 repair Case Study page to enable you to see before and after images of a typical repair. Balmoral Apartments, London, W2 1AL, PulsaCoil 2000 Repair Case Study is centered around a residential development that contains 78 high quality one, two and three bedroom apartments, that are within walking distance of Oxford Street and Hyde Park. Miss E is just one of the many customers we have worked for within this location.

Balmoral Apartments, London, W2 1AL, PulsaCoil 2000 Repair Case Study

Miss E first contacted The Plumbing Group when she discovered that she was no longer getting any hot water. Our engineers headed out to the property to find the reason for this. After thorough check on the boiler, they found that the time clock that controlled the heating of the off peak immersion had failed. As a result the wiring behind the casing had burnt out.

In order to fix this, firstly the burnt wiring had to be replaced. Secondly, the old time clock had to be taken out and a new one had to be put in. Once this was done, our engineer set the time clock for the customer. They set it to the correct times so that the boiler would heat in the most efficient and economical way.

The engineers kept Miss E updated throughout the repair so that she was aware of what was going on. The repair was carried out in under an hour and Miss E was extremely happy to have hot water again.

Call Us Now
WhatsApp WhatsApp us